North Coast Transmission Line

BC Hydro · Prince George to Terrace, BC

Overview

A new 500 kV line running from Prince George west toward Terrace, built in two phases to serve industrial electrification and port development on B.C.’s north coast. It is the largest transmission build in B.C. since the Site C era, and BC Hydro is repurposing the Site C worker camp to house it.

Owner
BC Hydro
Province
British Columbia
Location
Prince George to Terrace, BC
Category
Transmission
Phase
Construction
Estimated cost
$6 billion
Expected completion
2032

Latest update

BC Hydro published construction details and yard locations.

Phase 1 (Prince George to Glenannan) targets mid-2030; Phase 2 west to Terrace starts 2027 and targets winter 2032. Tower installation begins 2028.

Jun 24, 2026

Project timeline

  1. Jun 24, 2026

    BC Hydro published construction details and yard locations.

    Phase 1 (Prince George to Glenannan) targets mid-2030; Phase 2 west to Terrace starts 2027 and targets winter 2032. Tower installation begins 2028.

    Source ↗

Recent news

No matched coverage yet. Grid Monitor archives every article it matches to this project.

Sources

Also reported as: NCTL · North Coast Transmission · Prince George to Terrace transmission

Tracked since Sep 21, 2026

Looking for something else? Browse every tracked project.