All projects
PlanningNatural Gas
Brandon Generating Station Expansion
Manitoba Hydro · Brandon, MB
Overview
Three new natural gas turbines at Brandon, included in Manitoba Hydro’s 2025 integrated resource plan as dependable winter capacity behind a largely hydro and wind system. It is the province’s only significant thermal addition and a notable departure for a utility that is otherwise almost entirely renewable.
- Owner
- Manitoba Hydro
- Province
- Manitoba
- Location
- Brandon, MB
- Category
- Natural Gas
- Phase
- Planning
Latest update
Included in the 2025 integrated resource plan.
Jan 1, 2026
Project timeline
Recent news
No matched coverage yet. Grid Monitor archives every article it matches to this project.
Sources
Also reported as: Brandon gas turbines · Manitoba Hydro Brandon turbines
Tracked since Sep 21, 2026
Looking for something else? Browse every tracked project.